MACEDONIA
Constributing to Macedonia electricity generation and being established as A green signature to the World
![](https://sah.international/wp-content/uploads/2023/02/62F51647-34E1-4746-AA15-E6B108D10B48-1024x683.jpeg)
![](https://sah.international/wp-content/uploads/2023/02/F056483C-44E0-467A-A192-73FCF95DD8F3-1024x288.jpeg)
![](https://sah.international/wp-content/uploads/2023/02/A708FF9C-8717-4C27-AA8D-C2FA78F26344-1024x569.jpeg)
SOLAR POWER PLANT
Location: armatus, Macedonia
Contractor: Promark Energy
Capacity: 300 MWp
Shareholder Structure: Sah International
Electricity Generation:
Commercial Operation Date: 2023
Total Invesment Cost: 219 Million Euro
Financing: Deutsche Bank
ROMANIA
Constributing to Romania electricity generation and being established as A green signature to the World
![](https://sah.international/wp-content/uploads/2023/02/D75CAEBA-41AD-4DB9-A5BA-F047B528055D.jpeg)
![](https://sah.international/wp-content/uploads/2023/02/4D87085F-AF5C-4AE5-BBC1-17130FBD0171-1024x569.jpeg)
![](https://sah.international/wp-content/uploads/2023/02/97835FDD-22D0-4359-8F1B-C9DF2E7216A6-1024x555.jpeg)
SOLAR POWER PLANT
Location: maruntei, romania
Contractor: sah Energy
Capacity: 105 MWp
Shareholder Structure: Sah International
Electricity Generation:
Commercial Operation Date: 2023
Total Invesment Cost: 80 Million Euro
Financing: Deutsche Bank